Starbucks and Mercedes-Benz High-Power Charging have opened their first joint EV charging station in Red Bluff, California. The facility, located along Interstate 5, became operational ahead of the Thanksgiving travel period.
Highlights
- Charging speeds reach up to 400 kW, capable of adding approximately 300 miles of range in 10 minutes
- Universal compatibility with both NACS and CCS connectors at every stall
- First location in a planned corridor spanning I-5 from Washington to Southern California
- Open to all EV brands regardless of manufacturer

Technical Specifications and Compatibility
The Red Bluff station features high-power chargers delivering up to 400 kW output. Each charging stall includes dual connector options:
- NACS (North American Charging Standard)
- CCS (Combined Charging System)
This dual-connector approach eliminates adapter requirements for drivers of any EV brand, addressing a common pain point in public charging infrastructure.
Strategic Corridor Development
The Red Bluff location represents the initial phase of a broader infrastructure initiative. The partnership aims to establish an electrified I-5 corridor connecting major destinations between Washington and Southern California.
The co-location model integrates charging infrastructure with existing Starbucks retail locations, allowing drivers to utilize amenities during charging sessions rather than waiting at standalone stations.
Additional station locations and deployment timelines have not been announced.
Source: Starbucks Newsroom
Sign up for our popular weekly email to catch all the latest EV news!







